RANGERS 2K Protective polyurethane coating 3:1 | black 1 kg set

RANGERS 2K Protective polyurethane coating 3:1 | black 1 kg set
search

€81.90 Tax included

66.59 € tax excl.

Dostępny

Best brands
Fast shipping
20 years in business

Protective coating with excellent chemical (oil, gasoline, water, salt) and mechanical resistance (scratches, stains). Resistant to weather conditions (UV filters) and corrosion (anti-corrosive agents). Can be painted on various substrates. It can be applied with the UBS antigravel gun as well as with a conventional gravity spray gun.

32 Items
24-48h
Paczkomaty - 10.90 zł / Kurier - 13.90 zł
Quantity

 Substrates
  • Steel, galvanized steel, stainless steel, aluminum – prime surfaces with a 2K epoxy primer or 2K acrylic primer, sand using abrasive paper with gradation from P180 to P320, clean and degrease (Silicone Remover Troton).
  • Polyester laminates – sand using abrasive paper P180 or by using Troton’s unwoven abrasive fabric, clean and degrease (Silicone Remover Troton).
  • Polyester body fillers – sand using abrasive paper with gradation from P120 to P240, clean and degrease (Silicone Remover Troton).
  • Plastic surfaces – degrease (Silicone Remover Troton), sand with abrasive paper P240 or with Troton’s unwoven abrasive fabric, degrease again (Silicone Remover Troton), prime with an adhesive promoter, such as Plastic Primer Troton. Due to the many different types of plastic, adhesion testing is advised.

 Do not apply the product directly on bare metal. Rangers should be applied on primed surfaces or on 2K topcoats and basecoats after proper preparation (be careful with the application on old coatings, thinner testing is advised). Always abrade, clean and degrease the surface before application. Do not apply Rangers directly on bare original paint or directly on coatings of car body parts from the aftermarket.


 Application process UBS gun
Mixing proportion

3:1 - by weight: 790g+210g, by volume: 630ml+210ml

Shake the product before opening. Open the lid, add hardener and close back the lid. Shake very well.

Number of layers

2 layers. 1 dry layer of approx. 150µm. 1

First layer: spray evenly with sweeping motion and pressure of 2-4 bar until the proper coverage is obtained. The distance from the surface to be painted should be of approx. 50cm.  Allow to flash off for 30÷50 minutes between coats. In order to obtain the desired texture reduce the pressure and increase the distance from the surface to be painted. To achieve fine texture, apply the second layer with a fine spray by reducing the pressure and material flow. The distance from the object and pressure change the created structure.

Drying time
  • Dust dry: 1 h/ 20°C
  • Touch dry - ready for assembly: 3 days/ 20°C
  • Final drying (severe conditions): 7 days/ 20°C

Temperatures below 20°C significantly increase the hardening time.

Baking

In order to accelerate the physical drying time we recommend baking under a maximum temperature of 45°C for 50-60 minutes. Before baking wait the appropriate evaporating time of 1,5 to 2 hours after application. Caution! Baking does not accelerate the final drying time. It is recommended to wait 7 days to achieve total hardness of the coating (under severe conditions).


 Application proces gravity feed spray gun
Mixing proportion
  • 3:1 + 10÷20% thinner for acrylic systems
  • By weight: 790g+210g+74÷148g
  • By volume: 630ml+210ml+ 84÷168ml

Shake the product before opening. Open the lid, add hardener and close back the lid. Shake very well.

Number of layers

2 layers. 1 dry layer of approx. 50µm

First layer – spray evenly with sweeping motion, pressure of 2 bar until the proper coverage is obtained. The distance from the surface to be painted should be of 40cm. Allow to flash off for 30÷50 minutes between coats. In order to obtain the desired texture reduce the pressure and increase the distance from the surface to be painted. To achieve fine texture, apply the second layer with a fine mist spray by reducing the pressure and material flow.

Drying time
  • Dust dry: 1 h/ 20°C
  • Touch dry - ready for assembly: 3 days/ 20°C
  • Final drying (severe conditions): 7 days/ 20°C

Temperatures below 20°C significantly increase the hardening time.

Baking

In order to accelerate the physical drying time we recommend baking under a maximum temperature of 45°C for 50-60 minutes. Before baking wait the appropriate evaporating time of 1,5 to 2 hours after application. Caution! Baking does not accelerate the final drying time. It is recommended to wait 7 days to achieve total hardness of the coating (under severe conditions).


 General Notes 
  • Do not exceed recommended doses of the hardener!
  • The best repair results can be achieved by painting at room temperature. The temperature in the body shop and the temperature of the product should be similar.
  • When working with 2K products, it is recommended to use personal protection equipment. Protect the eyes and airways.
  • The rooms should be well ventilated.
  • Clean the guns and equipment immediately after use.

adr-ios-50.png Caution

To maintain safety, always follow the instructions given in the MSDS for the products.

VOC for mixture = 389/530 g/L
Troton
12167
5900763121675
Items

Thinner for RANGERS protective polyurethane coating | 1 L

The product intended for the dilution of Rangers polyurethane protective coating. The thinner is a mixture of carefully chosen high quality organic solvents perfectly balanced to enhance the performance of Rangers products. It ensures the proper application, fluidity, drying and achievement of...

€22.99

18.69 € tax excl.