The product is compatible with all standard primers, putties and varnishes (except 1K nitro-diluted products).
Tech data
| Color |
amber |
| Base |
epoxy resin |
| Efficiency |
approx. 0.4 m2 / 100 ml |
Application
- - The best temperature for aerosol application is 10 ÷ 25°C.
- - Shake the can for about 3 minutes before application.
- - The surface should be cleaned of rust, dirt and loose paint and degreased before covering.
- - When applying, hold the aerosol at a distance of 25 ÷ 30 cm from the surface to be covered.
- - Apply 3 - 4 layers of the product, depending on the degree of corrosion.
- - Heating the element after the application of the product will increase its protective properties. Leave the applied coating 15 minutes to dry then warm up for 15 minutes at max. 160°C.
- - It is recommended to set the aerosol with the valve down and press the button releasing the content for about 5 seconds - this will improve the re-use of the product and preserve its existing properties, as well as protect the nozzle from possible clogging.
Note: for safety purposes, always follow the data on the Material Safety Data Sheet for the product.
Drying times (at 20°C)
- - dust-dry after about 1 hour
- - ready to cover after approx. 6 hours
*at 20°C and 50% relative humidity
Caution
To maintain safety, always follow the instructions given in the MSDS for the products.
 |
VOC for mixture = 697,5g/L |